Sign In | Join Free | My fnxradio.com |
|
Brand Name : JINZHOU SHITAN
Model Number : ST-350
Certification : ISO
Place of Origin : China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, Western Union
Supply Ability : 20000 sets per year
Delivery Time : 7-10 days
Packaging Details : Standard Export Package
Product Name : ST 350 Water Well Drilling Rig
Model : Water well drilling rig
Machine Type : Drilling Equipment
Hole Diameter : Customized
Drilling Depths : 350meters
Condition : New
Weight : 8.9 T
Warranty : 12 months
Rotation torque : 7500Nm, 983 N.m, 4200N.m, 3400mm
Air consumption : 16-30 M3/min, 20-100m3/min, 17-31m3/min, 16-30cubic meter/min
After sale service : Video Support
ST 350 Water Well Drilling Rig Introduction:
It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and so on
ST 350 Water Well Drilling Rig Technical Data:
Product Name | ST 350 |
Power Type | Diesel |
Place of Origin | China |
Brand Name | SHITAN |
Usage | Water Well Drilling Rigs |
Dimension(L*W*H) | 6400MM*2250MM*2700MM |
Weight Of Machine | 8.9 T |
Certification | ISO9000 |
Warranty Time | 12 Months |
Color | Blue,red ,yellow |
Drilling diameter | 152mm-305mm |
Depth | 25M |
Rotary speed | 0-90rpm |
DTH | K40 |
Drilling Rods | 76*2m+76*3m |
Air consumption | 13-20m3/min |
Travelling speed | 0-2.5km/h |
ST 350 Water Well Drilling Rig Main Features:
In the drilling process of water well drilling rig,what should we pay attention to?
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.
![]() |
Deep Groundwater Source Water Well Service Rig 350 Meters Industrial Images |